Barry, avenue

Type of work

  • Replacement of water and sewer mains (sanitary and storm)
  • Rehabilitation of roadway structure and concrete structures
  • Upgrade lighting system with LED luminaires
  • Addition of measures to promote active mobility and user safety:
    • Sidewalk widened on even-numbered address side
    • Bike path on the odd-numbered address side
  • Updating road signs and markings

Information workshop

The Ville de Brossard organized a discussion workshop on January 30, 2025 regarding the Barry Avenue rehabilitation work.


Investment (estimate)

13 300 000 $


Obstacles / Impacts

During the work, traffic and parking will be prohibited in the work area. Only local traffic will be allowed. A temporary increase in traffic on peripheral streets is therefore to be expected in the area during this period.

Progress schedule

2025

Terminé 2025-2027

January 2025

Discussion workshop

Summer and autumn 2025

Project design

Autumn 2025

Public tender

2026

En cours

March 2026

  • Approval by the municipal council
  • Contract awarding

June through October 2026
Construction scheduled for June 12 through October 31, 2026

  • Complete renovation of the avenue, including underground infrastructure, the roadway, sidewalks, curbs, and street lighting.
  • Improvements to the street layout, including new green spaces, upgraded sidewalks, and a bike lane on the odd-numbered side of the street.
  • The avenue will be completely closed in the construction zone; only local traffic will be permitted.
  • Access is maintained at all times for emergency vehicles.
  • Pedestrians and cyclists must follow the temporary signage that has been put in place.

 

2027

Planifié

Summer 2027

Paving wear course